Independent Analysis

Demystifying the rules that shape our cities.

We analyze zoning codes, track permitting timelines, and explain urban planning policy through rigorous data and clear, actionable guides. Because better cities start with better policy.

14 months

Average permitting time for a multi-family project in major US metros.

75%

Of residential land in American cities is zoned strictly for single-family detached homes.

$84,000

Average regulatory cost added to the price of a new home.

Essential Guides

View all

Tools for Planners and Advocates

Stop guessing. We've built standard calculators to estimate Floor Area Ratio (FAR), project permitting timelines based on jurisdiction data, and calculate required parking minimums.

  • Open methodology with stated assumptions
  • Pure HTML fallbacks (works without JavaScript)
  • Based on standard municipal codes
Browse All Tools

FAR Calculator Preview

The Language of Planning

Planning documents are filled with jargon. We translate the terminology into plain English.

By-Right Development
A project that complies with all zoning regulations and does not require discretionary review or public hearings. Approval is administrative.
Spot Zoning
The practice of applying a different zoning classification to a single parcel of land that differs from the surrounding area.
Variance
An exception granted by a zoning board that allows a property owner to build outside the strict rules of the zoning ordinance due to hardship.
Upzoning
Changing a zoning code to allow for higher density or more intensive use, such as changing single-family zoning to allow duplexes.
Setback
The minimum required distance between a building and the property line, street, or other structure.
CEQA / NEPA
State and federal environmental quality acts that require public agencies to analyze and disclose environmental impacts of projects.

Our Methodology

The Institute for Planning was built on a simple premise: local government rules should be legible to the people who live under them. Currently, they are not.

Our data relies on primary sources. When we state that a permitting timeline averages 14 months, that figure is drawn from an analysis of thousands of raw permit records across 50 major US municipalities from 2022-2023. We do not rely on self-reported city targets, which consistently undercount review cycles.

Every guide on this site is reviewed by practicing urban planners and land-use attorneys. When rules vary by state (as they almost always do in the US), we explicitly note those differences rather than offering generic advice.

Frequently Asked Questions

Is zoning regulated at the state or local level?

Primarily local. Municipalities (cities and counties) write and enforce zoning codes, deriving their authority from state enabling acts. However, states are increasingly passing overriding legislation (like California's SB9) that preempts local control.

What is the difference between planning and zoning?

A comprehensive plan is a visionary policy document outlining how a city wants to grow over 10-20 years. Zoning is the legal, regulatory mechanism (the code and the map) used to enforce that vision on a parcel-by-parcel basis.

Can I build an ADU on my property?

This depends entirely on your jurisdiction, but many states (CA, OR, WA) have recently mandated that localities allow Accessory Dwelling Units by-right on single-family lots. Check our ADU guide for specifics.